• Paul Moossdorff

Rupture Discs - Radon Service, Underground Lab

Updated: Feb 5, 2019



A Customer was under time restraints for a project. The rupture discs assemblies they required needed to be completely welded with VCR fittings for Radon service. Helium leak rate was not to exceed X 10^(-8). The units were installed in the underground research facility. The Customer was especially pleased with the technical documentation provided in order to make sure the rupture discs matched their technical specifications.

#rupturediscs #radon #Oseco

Setpoint Technologies Inc.

10393 Sinclair Drive  Unit B

Ilderton, Ontario  N0M 2A0

Canada  

Tel:

Copyright Setpoint Technologies Inc. 2014